ABOUT US | PROJECTS | CORPORATE PRINCIPLES | BUSINESS LINES | ASSOCIATED COMPANIES | MEDIA CENTRE | CAREER CENTRE | SUPPLIERS | CONTACT US
 Projects
Newly Awarded
Ongoing
Completed
All Projects
Projects Search
   
Skip Navigation LinksArabtec Construction, L.L.C. > Arabtec Projects > Project

()

Head News Gallery
  1
Head News Project Profile
Project Name Al Fattan Marine Towers
Location Dubai Marina, Dubai, United Arab Emirates
Duration 33 Months
Client Al Fattan Properties
  Construction Cost AED 333 Million
  Consultant Norr Group Consultant
Head News Project Description

The Al Fattan Marine Towers project was awarded to Arabtec on the 1st June, 2003 for a lump sum contract value of AED 333 million. It was successfully handed-over in March 2006.

When completed in 2006, the Al Fattan Marine Towers were the seventh tallest buildings in Dubai and was located in the Dubai Marina near the Jumeirah Beach Residences Towers.

Arabtec carried out two phases of construction works on the towers with about 15 months difference in between. Phase 1 was the construction of Tower 1 and the podium while Phase 2 include Tower 2 from the podium top and above. The complex consists of the following features:

  • 3 Basements
  • Ground Floor
  • One Health Club Floor
  • Leisure Deck Floor, 2x52 Residential Floors Including 2 Service Floors
  • Main Roof with Steel Structure
  • External Fa├žade (Curtain Walls)
  • Total height of each building is approximately 252 metres.

Tower 1 was designed as serviced apartments operated by the Oasis Beach Hotel, while Tower 2, also known as the Al Fattan Tower, was sold as freehold properties.

Back To List
Contact Us . Site Map . Disclaimer . Privacy Statement . Feedback
ISO  
  Copyright 2011 © Arabtec Construction, L.L.C.